Main benefits Main benefits Main benefits OPEX reduction • One team for Operation and one team for Maintenance, for both Regasification and power plant. • Easily disconnectable and relocatable. • Plug and Play approach including blackstart, all utilities generated onboard. CAPEX reduction • Modules and barge are assembled in a ‘low cost’ yard up to sail away, including commissioning activities. • Utilities are common for both regasification and power plant. • Modules are standardized (easy extendability of the power plant). • Minimised Marine Works (only seven dolphins required for nearshore application, no jetty needed). HSE & Risk Bureau Veritas (BV), as a third party certification authority, has presented its Approval in Principal (AIP) for the Gas to Power design based on early design development. Specifically, BV has participated actively in initial safety and integrity reviews.