Gas & Low-Carbon Energies Gas & Low-Carbon Energies Gas-To-Power Barge (iLNGPTM) TYPICAL DEPLOYMENT TYPICAL DEPLOYMENT project experience project experience references references 2022@TechnipEnergies - All rights reserved • Integrated Gas-To-Power barge including LNG storage tanks and utilities in the hull, modularized Regasification unit, Combined Cycle Power Plant and buildings on the topsides. • The base case is 40 000 m3 LNG Storage and 200 MW power supply, easily extendable from 150 MW to 450 MW. Higher storage and electrical production can be envisaged on a case-by-case basis. Typical Deployment Project experience References • The barge is designed to be installed at quay or nearshore, a 12m water depth is required. For unloading operations, the LNG carrier will be side-by-side located, using ARCOS orflexible connections. • Additional export commodities such as LNG for bunkering or truck loading station, or NG can be provided. • An iLNGPTM version using cooling towers further reduces the environmental impact by generating no harbour seawater warming. None built to date, but advanced design development, basedon field proven combined cycle power plant (CCPP) technology. All components of this design are proven in other applications,the novelty is the merging of FSRU and CCPP on one single barge. Ref. : “Integrated LNG to power: where the two worlds plug and play ”Gastech 2020”